Home / Resources / Alaska

Alaska Building Permit Resources

Permitting how-to’s and local municipal guides.

Building in Alaska?

Let us handle the permit preparation, submission, and tracking across all municipalities you’re building in.

Talk to an Expert

Alaska Permit Guides

Learn about the permitting process for the municipalities you build in.

No guides found.

Permit in Alaska in days, not weeks

Book a Demo

Permitting in Alaska

Table of Contents

Alaska’s construction environment presents unique permitting challenges due to its extreme climate, seismic activity, and vast geography. Building codes and permit requirements are primarily administered at the local level, though the State of Alaska Department of Public Safety and Division of Fire and Life Safety maintain statewide oversight for certain facilities.

Whether you’re a general contractor, home builder, or developer building in or entering the Alaskan market, understanding what requires a building permit in Alaska, who issues them, and the special considerations tied to the state’s environment is essential to keeping projects compliant and on schedule.

Who issues building permits in Alaska?

Building permits are not issued at the state level, but rather by local municipalities and boroughs.

The main authorities having jurisdiction (AHJs) include:

Projects outside incorporated cities often require permits from the local borough government or fire marshal’s office.

When do you need a building permit in Alaska?

Most construction, renovation, and alteration projects require a permit. 

While each jurisdiction sets its own thresholds, in general you’ll need a permit for:

  • New residential and commercial construction
  • Additions or structural alterations
  • Decks, porches, and accessory buildings over a certain size (often 200 sq. ft.)
  • Plumbing, mechanical, and electrical system installations or upgrades
  • Demolition projects
  • Foundation, framing, and roofing replacements
  • Manufactured or modular home placement

Cosmetic updates — like interior painting, flooring, or cabinetry replacement — typically do not require a permit. Always check with your local permitting office for more specific regulations.

Alaska building permit requirements

Permit submission requirements vary by jurisdiction but generally include:

  • Completed building permit application
  • Site plan showing property boundaries, easements, and utilities
  • Construction drawings (stamped by an Alaska-licensed architect or engineer for commercial or structural projects)
  • Contractor license number (required through the Alaska Department of Commerce, Community, and Economic Development)
  • Energy code compliance documentation (for certain areas)
  • Payment of applicable fees

Commercial and multifamily projects may also require Fire and Life Safety plan review by the State Fire Marshal.

Alaska building permit costs

Permit fees in Alaska depend on the jurisdiction and the type or valuation of the project.

Here are some examples of building permit fees in the state:

Jurisdiction Typical Fee Structure Notes
Anchorage Based on project valuation Residential fees start at around $100; commercial projects scale upward
Fairbanks Based on square footage or valuation Additional mechanical/electrical fees may apply
Juneau Base fee + valuation multiplier Plan review fees often added separately
Mat-Su Borough Flat rate + value-based surcharge Fees vary by building type and use

Unique considerations when permitting in Alaska

Seismic and permafrost design

Structural design must account for seismic zones and soil conditions. Anchorage, for example, enforces stringent geotechnical reporting requirements.

Energy efficiency

Some municipalities, like Anchorage and Juneau, enforce the Alaska Residential Building Energy Efficiency Standard (ARBEES), requiring insulation, vapor barriers, and energy audits.

Remote project access

For rural or off-grid locations, coordination with the Alaska Department of Environmental Conservation (ADEC) for water and wastewater systems is often necessary.

Cold climate construction

Foundation, roofing, and insulation methods must meet local cold-weather construction standards.

Contractor licensing

Most construction contractors must hold an Alaska General Contractor or Specialty Contractor License issued by the Division of Corporations, Business, and Professional Licensing.

How to get a building permit in Alaska

The general steps for obtaining a building permit in Alaska are:

  1. Determine jurisdiction – Confirm whether your project falls under city, borough, or state fire marshal authority.
  2. Prepare documentation – Application, site plan, drawings, energy code compliance, and contractor license.
  3. Submit application – Online portals are available in Anchorage, Fairbanks, and Juneau; rural boroughs may require in-person submission.
  4. Plan review – Building officials and fire safety reviewers evaluate plans for code and zoning compliance.
  5. Pay permit fees – Fees based on valuation, square footage, or occupancy type.
  6. Receive permit – Must be displayed on-site throughout construction.
  7. Inspections – Conducted at key project phases (foundation, framing, electrical, plumbing, final).
FAQ

Frequently Asked Questions

Is PermitFlow available in my area?

Yes! As part of our commitment to deliver the best possible experience for pulling permits, we’re here to help you whether you permit in the municipality you frequent as well across multiple municipalities nationwide.

What are the benefits of permit software?

In short, the benefits of using our permit software are two-fold:

  • Faster & error-free permitting
  • Our software enables you to prepare requirement ready, error-free applications that save your team hours of time and shorten municipal review cycles so you can get to construction faster.
  • Centralized permitting
  • Submit, track, and pull permits all of your permits in a single, centralized platform and avoid deciphering municipal websites. Our solution enables you to stay up-to-date on all of your projects across all of the municipalities that you are operating in.
How long does it take to pull a permit with PermitFlow?

The time it takes to pull a permit is dependent on your project specifics as well as the municipality you are pulling the permit in; however, with PermitFlow’s platform, you will be able to submit requirement ready, error-free applications that save your team hours of time and shorten municipal review cycles by as much as 60%. Speak with an expert today to better understand what your estimated permitting cycle time would be.

How to get started with PermitFlow?

We have a team that is ready to support you with all of your permitting needs. Speak with an expert today to get onboarded with PermitFlow.

Categories
Learn about permitting, industry trends, tips, and customer stories.
Content by Role
Find the most useful and relevant information for your projects by exploring our articles by role.
Learn by State
Filter resources by state to get the most up-to-date and accurate information on permitting requirements and regulations. You can now see how the permitting vary from state to state and from municipality to municipality. Select a state below to learn more.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Permitting without the headache

Book a Demo