Home / Blog / Little Rock Building and Trade Permit Guide
Municipal Guides
Feb 12, 2026

Little Rock Building and Trade Permit Guide

Francis Thumpasery
Table Of Contents

If you’re managing construction, renovation, or trade work in Little Rock, Arkansas, pulling the right permits is a critical first step — and one that can quickly slow a project down if details are missed.

This guide focuses specifically on Little Rock building permits, including what requires a permit, what’s exempt, how fees are calculated, how long permits last, and how inspections work. Use this guide to plan accurately and keep projects moving without unnecessary delays.

Simplify permitting in Little Rock with PermitFlow. Learn how.

What requires a building permit in Little Rock?

A building permit is required for any work that exceeds $5,000 (including material and labor) or that requires an inspection.

That means you’ll likely need a permit for work that involves:

  • New construction 
  • Adding onto an existing structure
  • Demolishing a structure
  • Replacing windows, doors, and other major renovations
  • Major plumbing, electrical, and mechanical work

Work that doesn’t require a Little Rock building permit

Little Rock’s ordinance lists these as excluded from the permit requirement:

  • Residential fences under 7 feet tall
  • Residential roofs
  • Painting
  • Floor coverings and other cosmetic changes
  • One-story detached accessory structures (tool/storage sheds, playhouses, similar) <200 sq ft

For full details on other exceptions, review the Ordinance to amend chapter 8, article II, division I, §4 8- 31 (C).

Little Rock building permit cost

Permit fees in Little Rock are based on project type and construction valuation. Below is a general breakdown for residential and commercial work:

Building permit fee schedule (by total valuation)

Total valuation Fee
$5,000.00 and less No fee unless inspection required, in which case a $25 fee per inspection
$5,000.01 to $50,000.00 $50 for first $2,000 + $4 per additional $1,000 (or fraction thereof)
$50,000.01 to $100,000.00 $250 for first $50,000 + $3.50 per additional $1,000 (or fraction thereof)
$100,000.01 to $500,000.00 $420 for first $100,000 + $3.00 per additional $1,000 (or fraction thereof)
Over $501,000.00 $1,620 for first $500,000 + $2.50 per additional $1,000 (or fraction thereof)

Residential Certificate of Occupancy (CO) fees

Item Fee
Residential CO (new single-family, duplex, townhouse) $30
CO for existing buildings / change in use only $100
CO update $100

Commercial Certificate of Occupancy (CO) fees

Item Fee
Commercial CO (new building/addition with associated building permit) $60
CO for existing buildings / change in use only $100
CO update $100

Commercial plan-checking fee (when required)

If valuation exceeds $5,000 and plans must be submitted (per Arkansas Fire Prevention Code):

Item Fee
Commercial plan-checking fee 50% of building permit fee
Minimum plan-checking fee $55

Other fees to be aware of:

  • Minimum fee for any building permit: $50
  • Data processing fee: $25
  • Act 474 surcharge (commercial projects only): $0.50 per $1,000 of construction value, max $1,000

To learn more about building permit fees, view the Ordinance to amend chapter 8, article II, division I, §4 8- 31 (C).

How long do building permits last in Little Rock?

Little Rock building permits expire one year from the issuance date. Here's what you need to know about expiration and extensions:

Standard permits ($100 or more):

  • You can request extensions of up to one year after expiration
  • Extension requests must be in writing showing just cause
  • Extension fee: $100 per year

Lower-cost permits (under $100):

  • Valid for one (1) year from issue date
  • Extensions of up to 90 days available
  • Extension fee equals the original permit fee cost

Permit becomes invalid if:

  • Work doesn't start within six months of permit issue date, OR
  • Work stops or is abandoned for six months after starting

When resuming work after invalidation, you must obtain a new permit. The fee is half the original permit cost if no plan changes were made and the lapse didn't exceed six months.

A one-time extension before expiration is available if you can show a good reason beyond your control why work couldn't start within six months. You must apply before the permit expires.

Little Rock trade permits

Plumbing permits

Permits are needed for new plumbing installations, fixture additions, or drain/sewer replacements.

Item Fee
Each plumbing fixture outlet / appliance $6
Backflow prevention device $30
Sump $8
Swimming pool $14
Renew soil line $8
Renew gas vent $8
Gas housepiping $30
Additional opening $6
Floor furnace $17
Unit heater $17
Wall furnace $17
Commercial dryer $17

Minimums and surcharges:

Item Fee
Minimum plumbing permit fee $50
Work started without permit 3x the permit fee
Work outside city limits +50% surcharge

Electrical permits

Any new circuits, panel upgrades, or service changes need an electrical permit.

Item Fee
Meter loop (first) $16
Meter loop (each additional) $8
Motor/gen wiring up to 1 hp $6
2–4 hp/kW $9
5–10 hp/kW $14
11–15 hp/kW $17
16–20 hp/kW $21
21+ hp/kW $25
Temporary power to building $25
Smoke/CO detectors (1–4) $12
Each detector over 4 $5
Disposal / ceiling fan / vent hood / bath fan / exhaust fan (each) $6
Electric heat 1–15 kW $8
Electric heat 16–25 kW $15

Minimums and surcharges:

Item Fee
Minimum electrical permit fee $50
Work started without permit 3x the permit fee

HVAC permits

HVAC permits apply to furnace, duct, and A/C installations and changes.

Fees for commercial and residential replacements, repairs, alterations and additions are based on valuation:

Total valuation Fee
$500 and less No fee unless inspection required, in which case $25 per inspection
$100.01 to $50,000 $50 for first $2,000 + $6 per additional $1,000 (or fraction thereof)
$50,001 to $100,000 $350 for first $50,000 + $5.75 per additional $1,000 (or fraction thereof)
$100,001 to $500,000 $640 for first $100,000 + $5.50 per additional $1,000 (or fraction thereof)
$500,001 and up $2,840 for first $500,000 + $5.00 per additional $1,000 (or fraction thereof)

Other fees:

Item Fee
Inspection (each) $25
Re-inspection (each) $45
Investigative inspection (each) $45
Minimum mechanical permit fee $50
Work outside city limits +50% surcharge

How to get a building permit in Little Rock

Step 1: Prepare your plans and documents

Before you apply, gather:

  • A completed City of Little Rock building permit application
  • A site plan/survey (recommended for additions, exterior work, and anything that affects setbacks)
  • Floor plans and any structural details needed for the scope
  • A clear project valuation (the City uses valuation to calculate fees and may request documentation)

Note: Little Rock requires separate permits for electrical, gas, plumbing, and mechanical work, even if you also have a building permit.

Step 2: Submit your application

Apply through the City’s Dynamic Portal. After you create an account, you can submit the application and plans, revise your submission, pay fees, and request inspections.

Step 3: Plan review

City reviewers check code compliance and may route items to other groups depending on the project (zoning/landscaping, public works, fire, utilities, etc.).

Plan review timing: Expect five working days of processing time. However, requests for corrections and missing info can extend timelines.

Step 4: Pay permit fees

Once approved, you’ll receive an invoice. There is a Data Processing Fee of $25 in addition to permit charges. If commercial work requires plan review, the City charges a Commercial Plan-Checking Fee equal to ½ of the building permit fee (minimum $55) and it’s non-refundable.

Step 5: Start work and post the permit

Once your permit is active, begin work and schedule inspections for required stages.

Little Rock’s Selectron system allows scheduling:

Take control of permitting in Little Rock.
PermitFlow centralizes permitting from submission through final inspection. Learn more.

Permit inspections in Little Rock

All permitted construction in Little Rock must pass one or more inspections. Inspections confirm the work matches code requirements and the approved plans.

Inspections are commonly required for:

  • Footings and foundations
  • Framing (and other structural phases, depending on scope)
  • Electrical / plumbing / HVAC rough-ins (when those trades are part of the project)
  • Final inspection (and Certificate of Occupancy steps for projects that require a CO)

How to schedule an inspection

Little Rock uses the Selectron/WebPermits system. You can schedule, cancel, reschedule, and check results in three ways:

  1. Online: Use inspections.littlerock.gov (WebPermits). You’ll need your permit number.
  2. By phone: Call (501) 588-7493 and follow the prompts to schedule/cancel/reschedule or check results.
  3. By text: Text “SCHEDULE” to (855) 949-5403 (you can also text “CANCEL,” “RESCHEDULE,” or “RESULTS”).

Tip: When you request an inspection by text, you can include a preferred date and AM/PM preference.

Inspection timelines

You can request a preferred date and AM/PM preference, but the exact timing depends on inspector availability.

If an inspection fails, you’ll need a reinspection after corrections are made (reinspection fees may apply).

Closing out your permit

To finalize your permit:

  • Pass all required inspections
  • Submit any closeout documents the reviewer requests (only if your permit has those conditions)
  • Receive a Certificate of Occupancy (for new builds / certain commercial work) or the City’s closeout sign-off

Close out your projects with speed and confidence.
PermitFlow automates inspection scheduling, coordination, and closeout so you can focus on your next project. Learn more.

Little Rock permitting resources

Streamline Little Rock permitting with PermitFlow

Pulling permits in Little Rock shouldn't drain your resources. If you’re spending more time applying for permits than moving projects along, it’s time to automate the process.

PermitFlow can help.

Our AI-powered platform automates the Little Rock permitting process, including timeline tracking, extension requests, and compliance monitoring. Submissions are prepared up to code, routed correctly, and monitored through approval and closeout. Teams get visibility into what’s due and what’s at risk without chasing portals, emails, or spreadsheets.

Construction teams and trades pros use PermitFlow for:

  • In-depth local knowledge: Our specialists understand Little Rock’s unique permit expiration rules, extension procedures, and fee structures, which prevents costly invalidations.
  • Proactive deadline management: Clear tracking of inactivity thresholds, expiration dates, and next actions.
  • Seamless tracking: Monitor all your permits through one platform with clear visibility.
  • Nationwide coverage: Extend reliable permit management throughout Arkansas and across the country with one consistent system.
If permitting is slowing you down, contact us to see how PermitFlow helps you stay compliant without losing momentum.

Recommended for you

Show All Resources
Show All Resources
Categories
Learn about permitting, industry trends, tips, and customer stories.
Content by Role
Find the most useful and relevant information for your projects by exploring our articles by role.
Learn by State
Filter resources by state to get the most up-to-date and accurate information on permitting requirements and regulations. You can now see how the permitting varies from state to state and from municipality to municipality. Select a state below to learn more.